Edition: abc5c37db6256889edecf814a809bcbe3dc326cb9c770f5fb2e3eab049e91802
---
id: OM.G02
kind: guide
title: Classify Work for a Decision
version: 0.2.1
language: en
author: Anna Lubenchenko
license: CC-BY-4.0
license_url: https://creativecommons.org/licenses/by/4.0/
editorial_status: draft
distribution: public
intended_use: Choose only the work distinctions needed for routing, priority, resource allocation or forecasting.
applicability:
- A mixed intake needs a usable classification.
- New tracker fields are proposed without a defined receiving decision.
source_refs:
- id: AOM-OPS-GUIDES-2026-11-26
description: Internal design input for decision-specific origins of unplanned work; no universal partition or allowance is asserted.
- id: AOM-R1R4-2026-11-26
description: Authored synthesis from internal design discussions; no universal classification is asserted.
relations:
- type: explains
target: OM.P15
note: Separate classes only where routing, provision or receiving conditions affect the model.
- type: explains
target: OM.P14
note: The intended decision selects a useful distinction and its evidence.
validation_refs: []
---
# Classify Work for a Decision
A classification is useful when distinguishing its classes changes a decision or the grounds for it. Start with that decision and an actual mixed set of requests. Do not begin by making every available attribute mandatory.
| Decision | Distinction that may matter | What the label alone does not establish |
|---|---|---|
| Choose a route | Incident response, standard service, unfamiliar investigation or planned change | Readiness, priority or permission to act |
| Allocate provision | Required capability, access, shared equipment and need for joint work | Availability in the relevant interval |
| Reconsider order | Consequence of delay, applicable commitment and protective response rule | Urgency merely because the requester is senior |
| Forecast a result | Comparable work family, receiving completion event, calendar and relevant conditions | A deadline from an arbitrary size label |
| Explain a changing backlog | Stable case identity and comparable entry/exit rules | The effort or completion date of each remaining case |
Select the smallest set of distinctions that supports the question. Test it on real examples: does it route a case differently for a stated reason, identify missing provision or prevent a misleading forecast? If two cases require different actions but receive the same label, refine the consequential distinction. If extra labels never change the use, consider omitting them and their maintenance burden.
Keep the original request linked to its internal work items. A request may need several routes and an eventual join. Splitting it changes the records; it does not create extra accepted customer results or restart the customer's waiting clock. A parent case, an implementation task and a work product have different counting rules.
## Distinguish why work was outside the plan
Use an origin distinction when it changes the next operating decision. A common label such as “unplanned” can combine necessary work omitted from the selected representation, genuinely new demand and a newly discovered condition within accepted work. Those cases need not have the same remedy.
| Relevant origin | What to establish | Possible receiving decision |
|---|---|---|
| Necessary supporting work was absent from the representation | Whether it was already required and known, and whether its effort was already included elsewhere | Repair scope, preparation or resource accounting without counting it twice |
| New external demand arrived | The request and arrival event, actual necessity and service rule, current commitments and permission | Admit, defer, decline or reconsider competing work under the applicable authority |
| New knowledge or a material condition arose within accepted work | What changed, when it became knowable, the affected remaining work and receiving result | Revise the method, remaining scope, provision or promise through its decision holder |
These are useful origins, not a mandatory mutually exclusive taxonomy. A late-recorded external request can also have been missing from a particular plan. Keep the dimensions separate when both matter: what was known at planning, why work is necessary now, whether an applicable rule makes it urgent, whether it has started, where its load is already counted and which commitment is affected. “Unplanned” alone grants no permission to start and does not establish that the work was unforeseeable or cannot be stopped.
For a small decision, a few evidenced episodes and their consequences can suffice. If choosing an allowance or forecasting a period requires frequency and demand, preserve the population, interval, denominator, unknowns and overlapping contributions. Do not start from a universal contingency percentage. [OM.P11](../patterns/OM.P11-discover-and-account-for-invisible-work.md) can recover omitted work; [OM.P13](../patterns/OM.P13-ground-and-qualify-a-work-request.md) can reconsider its current grounds.
## Constructed examples
Over a stated interval, twelve cases enter and four leave the same open-case boundary, with no other additions, removals, splits or merges. The open count rises by eight. Their internal complexity need not be equal for that inventory statement. The count does not establish resource shortage, a waiting-time forecast or which case should start next.
For a particular request, “change” may still be too broad: one variant can be completed by any authorized operator, while another needs two specialists together. Add that distinction for allocation. If the specialists can later perform the second variant independently under a qualified method, revise the provision assumption; do not retain the pair requirement because it was once written in a template.
An old unresolved request needs a disposition consistent with its current need and commitments. Age can trigger review; age alone does not authorize cancellation. Likewise, no universal one-to-three-day task size or utilization threshold follows from this guide. Choose work boundaries from useful receiving results, dependencies, feedback and coordination cost.
The same ten hours outside an initial plan can have different continuations. A required review omitted from the view calls for a scope/accounting repair; if its hours were already estimated, they are not added again. A new customer request needs a demand and commitment decision. A newly discovered necessary check inside an investigation needs a revised continuation and, where affected, a changed promise. Discovering that check after sound preparation is not automatically evidence of defective task setting.
## Return and check
Return the decision, selected class meanings, examples, actions they change, unresolved cases and the condition for revision. A small table can suffice. Recheck when the route, capabilities, commitments, counting policy or receiving use changes. This authored draft and its examples are not a validated classification for a particular enterprise.
Version 0.2.0 adds origins of unplanned work only where they change the receiving decision. The distinctions and examples are authored design input; they do not establish occurrence frequencies or a capacity reserve.
## Attribution and source scope
Authored AOM text: Anna Lubenchenko, [CC BY 4.0](https://creativecommons.org/licenses/by/4.0/). Source contributions and limits are identified in the [public bibliography](../../bibliography.md).
Content SHA-256: aad3650a32d8891df08613c98d8c69071bbb07c043050013378a1c7dcb096362