Edition: abc5c37db6256889edecf814a809bcbe3dc326cb9c770f5fb2e3eab049e91802
---
id: OM.P04
kind: pattern
title: Prepare and Admit Work Proportionately
version: 0.1.2
language: en
author: Anna Lubenchenko
license: CC-BY-4.0
license_url: https://creativecommons.org/licenses/by/4.0/
updated: 2026-11-27
editorial_status: draft
distribution: public
intended_use: Prepare the next useful operation and make or propose a bounded admission decision using current inputs, qualified provision, receiving conditions and actual authority.
applicability:
- A grounded request and suitable method need an operational readiness or start decision.
- Preparation, slicing or an inquiry could make the next result usable sooner without removing required outcome or protection conditions.
source_refs:
- id: AOM-SEVEN-BOOKS-2026-11-26
description: Authored application informed by the cited seven-book sources; public editions, bounded contributions and transfer limits are identified in the bibliography.
- id: TENDON-TAMEFLOW-2022
description: Steve Tendon, The Book of TameFlow, edition 17 January 2022; chapter 12 pp. 195–204, chapter 14 pp. 226–230 and chapter 15 pp. 242–244. Full-kitting, minimal sufficient outcome and preparation are adapted without a universal fixed-scope or zero-cost rule.
- id: Vacanti-Seele-FlowMetrics-2022
description: Daniel Vacanti and Will Seele, Flow Metrics for Scrum Teams, Leanpub edition dated 10 August 2022; chapter 7, slicing for earlier feedback. Candidate routes are adapted while preserving mandatory acceptance bundles and counting additional coordination and review.
relations:
- type: requires_result
target: OM.P13
note: Reuse sufficient grounds for the proposed next step; obtain only a material purpose or outcome gap before admission, preserving an independently authorized protective response.
condition: "Admission depends on a material unresolved purpose or intended-result question."
result: "Sufficiently grounded purpose, receiving result and consequential uncertainty for the next operation."
reuse_or_stop: "Reuse adequate grounds; a missing ordinary grounding result does not suspend an independently authorized protective response."
- type: requires_result
target: OM.P14
note: Use a suitable method and prepared operation with its input and receiving product; a method recommendation alone supplies no resource window or authority.
condition: "The next operation lacks a justified method or usable preparation account."
result: "A selected suitable method, bounded operation, input needs, work product and receiving use."
reuse_or_stop: "Reuse a current adequate preparation note; method selection leaves resource allocation and admission to their actual rules."
- type: requires_result
target: OM.P05
note: Reuse an adequate window or obtain the missing shared-resource check when the proposed start consumes contested provision; include preparation and review demand.
condition: "The proposed start consumes contested provision and its usable window has not been established."
result: "A shared-resource feasibility result including preparation, execution, review and protected reservations."
reuse_or_stop: "Reuse an adequate window or schedule; an uncontested established window does not require a new scheduling exercise."
- type: continues_with
target: OM.P19
note: Return a conflict across current service, several packages or future capability when local admission cannot preserve their commitments and protections.
condition: "Local admission exposes a conflict across work packages, service or future capability that it cannot settle."
result: "The bounded proposed start, its local readiness result and the specific affected commitments or protections."
reuse_or_stop: "Stop at local admission when it settles the question; reuse an adequate cross-case disposition when its conditions hold."
validation_refs: []
---
# OM.P04 — Prepare and Admit Work Proportionately
Use this method when a queue owner or authorized practitioner must decide whether a particular operation may start, what must first be prepared, or which smaller useful continuation fits the available conditions. The result is an admission decision under an existing rule, a conditional proposal, or a precise return for missing preparation. A suitable method, a funded initiative and a populated ticket each leave this question open until the relevant operating conditions are established.
This is an authored draft. Its examples are constructed, its local policies are supplied assumptions, and its effectiveness has not been established by agent or field evaluation.
## Minimum inputs and short path
Recover the current receiving result, the next operation and its method, the product/version to be acted on, indispensable inputs, necessary competence/access, usable resource window, relevant dependencies, acceptance or next-use conditions and the governing admission rule. Preserve existing commitments and independent protection. A current adequate preparation note from [OM.P14](OM.P14-select-a-method-and-prepare-the-next-step.md) can supply much of this account.
For a familiar small repair, ready inputs, a suitable available window and an applicable standing rule can settle the decision directly. Apply that rule and check the resulting work. There is no required ceremony, percentage of analysis or universal Definition of Ready. An authorized immediate protective response follows its own rule; this method does not delay it for ordinary backlog preparation.
## Procedure
1. **State the exact admission question.** Identify the case, version, next operation, intended product and receiving use. Separate selection of an option, an accepted commitment, admission into a controlled population and actual start. Establish which of these the current authority can decide.
2. **Reuse sufficient grounds and method.** Confirm the purpose and suitable way of obtaining the next product. Use [OM.P13](OM.P13-ground-and-qualify-a-work-request.md) or [OM.P14](OM.P14-select-a-method-and-prepare-the-next-step.md) only for a gap that can change the decision. An inquiry may legitimately begin with an unknown solution; it still needs a useful question, applicable method and bounded receiving product.
3. **Check the inputs required at this point.** Recover configuration, information, material, permissions, environments and external contributions. For each consequential dependency identify when it is needed and what establishes availability then. Do not require every eventual input before a genuinely independent earlier operation, or call an operation ready when its indispensable input is unknown or known absent. A forecasted arrival remains a condition until the required availability is established.
4. **Check actual provision and protected work.** Include preparation, execution, review, support and any necessary operator return in the same qualified calendars. Preserve reservations for recovery, service and human conditions. Use [OM.P05](OM.P05-protect-shared-capacity-and-control-release.md) for the missing feasibility result. A free WIP permit, a nominal owner and unused budget cannot substitute for a usable window.
5. **Resolve the receiving boundary.** Specify what establishes completion of this operation, who or what uses its product, and the applicable transfer or acceptance rule. Preserve mandatory integration and final acceptance for the larger outcome. The next recipient can accept a bounded discrepancy account without accepting the untested product to which it refers.
6. **Choose the smallest sufficient preparation or slice.** Compare direct start, targeted preparation, a smaller usable step, a separate inquiry, deferral or a qualified alternative. Apply the branches below when they can change the decision. Include their full burden and avoid additional decomposition that creates no earlier useful result.
7. **Apply the actual admission and exception rule.** Record the controlled boundary, eligibility, permit or workload effect, current inputs/provision, responsible holder and disposition. Use standing delegated authority when it suffices. If an unresolved condition prevents an unconditional start, name the dependent operation and permitted independent work. A request for a missing input does not establish that it has been supplied.
8. **Verify the next event and retain the continuation.** On execution, preserve actual start, result/version, required checks and transfer evidence. Preparation completion does not establish later acceptance or benefit. Keep remaining work, original waiting origin, current obligation and the condition that would stop, recall or reopen the operation.
## Admit preparation as work
Preparation can reduce avoidable late questions and returns. It also consumes attention, tools and review, and can produce decisions or artifacts that become stale before use. Control that demand at the resolution needed for the next start.
Identify the intended receiving operation and when it needs the prepared result. Select enough preparation to support that operation without pretending to solve every future uncertainty. Name the contributor's actual capability and available window, any scarce-specialist consultation and the acceptance of the preparation itself. If the contributor is using apparent slack, distinguish a genuinely available window from availability reserved for catch-up or incidents. A quiet interval can be successful protected service.
When the arrangement permits borrowing reserved availability, state its actual recall conditions, detection and hand-back time, interruption/checkpoint method and authority. If the protected response can be needed sooner than hand-back permits, this preparation is not feasible in that window. Calling the work interruptible does not establish a safe interruption. Preparation in genuinely unreserved time can use the ordinary admission rule without a borrowing agreement.
Keep the prepared version, its dependencies and any material expiry or review trigger. A credential may have a known expiry; a design can instead become stale after an interface change. Do not invent a calendar expiry for every artifact. Limit upstream preparation where later use, change risk or review capacity makes more work unwarranted. No fixed queue size or percentage follows from the method.
If gathering missing knowledge needs substantial research, a prototype or a specialist trial, prepare that as a separate bounded inquiry with its own effort, inputs, receiving decision and stopping condition. It is not free incidental work merely because it precedes implementation. An adequate negative finding can complete the inquiry and justify stopping implementation under the relevant authority.
## Slice work for earlier usable feedback
A smaller piece helps when its result can be used or can change a receiving decision earlier. Splitting a ticket without changing the route, feedback or usable result can add coordination while leaving the same wait. Begin with the intended use rather than a preferred story size.
To generate candidates, start with one independently checkable acceptance criterion, one receiving user or scenario, or one consequential assumption that an inquiry can test. These are alternative starting points, not three required exercises. A candidate still has to pass the receiving-use, indispensable-bundle and resource checks below; separating a safety criterion on a card does not make it optional for release.
1. Identify the smallest candidate product that a real recipient can use or inspect for a named decision. It can be a working independent subset, a verified interface example, a discrepancy account or an inquiry result. Explain what earlier feedback could change.
2. Preserve the indispensable acceptance bundle. Identify which checks and components the slice needs and which remain mandatory for the whole result. A diagnostic product can be accepted for diagnosis without authorizing release of incomplete functionality. If nothing smaller is independently usable, retain the bundle and consider an earlier internal check with an honestly smaller claim.
3. Compare the actual routes. Include extra setup, deployment, coordination, review and revalidation from additional slices. A smaller transfer batch need not require a smaller production batch; preserve a shared setup when the method permits it. Use P05 when the extra visits affect common provision.
4. Check the current conditions and terms. Fit the slice into real windows, keep necessary protection and determine whether changing the promised outcome requires agreement. Earlier feedback is an anticipated benefit, not a realized result or permission to drop essential scope.
5. Return the slice, receiving decision, acceptance evidence, residual obligation and review trigger. If new information changes the worthwhile outcome, prepare the authorized scope/forecast revision through [OM.P06](OM.P06-reconcile-scope-forecast-and-promise.md); retain the original terms until that revision takes effect.
## Constructed example: preparation fits only after its review is counted
A developer has a two-hour window and current access to prepare test data for tomorrow's acceptance check. The supplied method needs 90 minutes of development and 30 minutes of the only qualified reviewer's attention. The reviewer has no suitable window before the check. The data need that review before use under the supplied rule.
The developer's window establishes only part of readiness. Return the missing review contribution and compare a later check, another actually qualified reviewer, or an independently useful preparation product. Starting the same preparation under an “urgent” label does not create reviewed data by tomorrow. If an earlier review allocation already includes this exact contribution, reuse it instead of counting another 30 minutes.
**Changed condition:** a qualified independent reviewer has a confirmed 30-minute slot after preparation and before the check, with matching access and acceptance authority. The preparation can be admitted under the standing rule once its other inputs hold. Naming an alternative reviewer without those conditions would leave the decision unresolved.
**Protection branch:** the developer's two-hour window is reserved for a response that may be required within ten minutes. This preparation has a minimum safe hand-back time of twenty minutes, and the standing rule does not permit weakening response. It cannot borrow that window. Unused time in a record does not establish excess capacity.
## Constructed example: an inquiry slice and an indivisible release
A release requires both a payment operation and a verified reversal path. The team proposes dropping reversal to fit the week. The supplied acceptance terms require both; that smaller release is inadmissible under unchanged terms.
An unresolved interface question can, however, be investigated earlier using a small test harness. Its receiving product is a versioned account of whether the supplied interface supports the required reversal and what remains unknown. A two-hour qualified window, required test access and a half-hour receiving review are supplied. Preparing that inquiry can be appropriate: its evidence changes the implementation choice while the release's mandatory scope remains visible. A negative answer can satisfy the inquiry's acceptance and reopen the release plan. It does not count as a released payment service.
**Changed condition:** an authorized recipient now accepts a genuinely independent nonpayment reporting subset, with its own adequate assurance and support. Compare and prepare that subset under the revised scope. The mere existence of separately named child cards would not establish independent use.
## Return, stopping and reopening
Return **next operation and product/version → inputs and method basis → qualified window and protections → receiving use/acceptance → preparation or slice selected → admitted, held or conditional disposition → actual authority → residual work and recall/review condition**. The existing work account can carry this information.
Stop once the start or exact missing contribution is settled. Do not expand a routine admission into an enterprise redesign. Reopen affected conditions after an input/version change, expired access, lost window, changed protected demand, unsuitable feedback, changed receiving use or revised commitment. If preparation is abandoned, preserve useful products and findings, actual costs, remaining duties and any required hand-back. A recorded admission is not evidence of execution.
## Grounds and planned checks
TameFlow supplies right-sized full-kitting, preparation using actual excess capacity and the distinction between target scope and permanently fixed scope. Its no-cost rhetoric, fixed ratios and universal restrictions on scope changes are not adopted. This authored procedure connects those contributions to the existing AOM request, method, capacity and commitment distinctions. The [public bibliography](../../bibliography.md#seven-book-sources) identifies the source editions, contributions and limits; the procedure is not a claim that the books establish this implementation's effectiveness.
Vacanti and Seele's chapter 7 informs the three ways to generate a candidate slice. Its contribution is a practical search for earlier useful feedback, not evidence that every acceptance criterion is an independently usable or releasable product.
Development cases must vary a missing versus existing review slot, independent versus protected availability, stale versus current preparation, legitimate inquiry with an unknown answer, and a usable slice versus a broken mandatory bundle. They must include a positive routine admission under standing authority and preserve emergency protection. No passing evaluations or field effects are attached.
## Attribution and source scope
Authored AOM text: Anna Lubenchenko, [CC BY 4.0](https://creativecommons.org/licenses/by/4.0/). Source contributions and limits are identified in the [public bibliography](../../bibliography.md).
Content SHA-256: 48a8a4026d95561e1c927f01e4873c19d45a6578e1cb3aab25dba97a4de72613