intended_use: Select a justified way to obtain the next useful result and prepare a bounded continuation with a work product and receiving use.
applicability:
- A sufficiently grounded request leaves the method or actionable next step unresolved.
- Several approaches, an existing result or a conditional continuation may serve the current decision.
source_refs:
- id: AOM-SEVEN-BOOKS-2026-11-26
description: Authored application informed by the cited seven-book sources; public editions, bounded contributions and transfer limits are identified in the bibliography.
- id: AOM-OPS-GUIDES-2026-11-26
description: Internal design input for work disposition, delegation, usable windows and support; examples are constructed.
- id: AOM-R1R4-2026-11-26
description: Internal authored extension from discussion material; examples are constructed.
- id: FPF-PUR-d325a051
url: https://github.com/ailev/FPF/blob/d325a051ac7b2bb37cd870f90b4ed8b2d0426e58/FPF-Spec.md?plain=1#L110526-L110971
- id: AOM-user-design-input-2026-11-20
description: Request to connect method selection with inputs, planning, the next work product, its recipient and acceptance.
relations:
- type: requires_result
target: OM.P13
note: Return to P13 only for a material grounding gap; an already adequate request need not be qualified again.
condition: "A material grounding gap prevents a justified method choice or continuation."
result: "A sufficiently grounded purpose, supported situation and intended receiving result."
reuse_or_stop: "Reuse adequate grounds; reopen only the premise changed by the present question or evidence."
- type: continues_with
target: OM.P16
note: Use observation when it answers the current inquiry.
condition: "The selected useful inquiry is to establish actual receiving use or adaptation of a product."
result: "The bounded use question, identified product and recipient, available evidence and justified observation scope."
reuse_or_stop: "Reuse adequate receiving-use evidence; do not invoke observation when the current inquiry is already answered."
- type: continues_with
target: OM.P15
note: Use route and event reconstruction when that result is needed.
condition: "The selected useful inquiry is to reconstruct a consequential route, event or shared-resource connection."
result: "The bounded operating question, required receiving result, consequential unknown and available accounts."
reuse_or_stop: "Reuse an adequate reconstruction; stop at the selected scope instead of extending to a complete enterprise model."
validation_refs: []
---
# OM.P14 — Select a Method and Prepare the Next Step
This is an authored draft for AI Operations Manager. Editorial review does not establish agent performance, independent practitioner validation or field effectiveness. It is available as a public source draft; this does not establish admission as validated runtime guidance.
## Use this when
The purpose is sufficiently clear, but “analyze,” “plan,” “implement” or a familiar method name does not tell the performer how to obtain the needed result. The question is which approach is justified now and how to prepare its first useful continuation, including a product someone can use.
The output is a method recommendation and a bounded preparation note, with readiness and authority left explicit. A method description explains how; a work plan allocates intended work; performed work requires occurrence evidence. Neither a recommended method nor its description establishes the other two.
Use [OM.P13](OM.P13-ground-and-qualify-a-work-request.md) only when a consequential grounding gap remains. Do not repeat qualification or research whose current result already answers this question.
## Mechanism and alternatives
A method chosen by familiarity can produce an artifact that does not resolve the receiving decision. A suitable method can still fail when its required input or capability is absent. A useful product can wait unused when its receiving role, acceptance condition or transfer path was never prepared. These mechanisms differ from lack of execution capacity and from a legitimate later change of direction.
The serious alternatives can include another method, a narrower inquiry, reuse of a current result, direct continuation, stopping, deferral or delegation. An additional analysis is justified only when its likely receiving value warrants its full burden. This comparison cannot silently waive an existing obligation.
## Minimum inputs
- The qualified request, current question and sufficiently bounded intended result.
- Available method descriptions with actual procedures, applicability and limits; a title or search snippet alone is insufficient.
- Relevant existing results, their source conditions and currency.
- Required inputs, capabilities, tools/access, protected commitments and any known resource windows.
- The proposed work product, receiving person or role, intended use and applicable acceptance/transfer rule, or the precise remaining gap.
Unknown availability does not necessarily invalidate an approach, but it prevents claiming unconditional readiness. Do not invent a method body, resource slot, recipient agreement or deadline to make the plan look complete.
## Procedure
1. **Name the immediate result question.** Decide whether the current need is to establish facts, discriminate explanations, compare options, design behavior, implement a known change or verify a result. These are possible needs, not mandatory lifecycle stages. Distinguish the next work product from the eventual operating benefit.
2. **Inspect a small set of serious approaches.** Read enough of each actual procedure to know its solution conditions, inputs, result and ordinary limits. Include the current approach or direct continuation when it is viable. If a reusable result exists, inspect its subject/version, question/use, source assumptions and currentness before proposing new work. Do not substitute a same-titled artifact for the needed content.
3. **Check fit before recommending.** For each serious candidate consider the problem frame, relevant pressures/trade-offs, solution conditions, ordinary boundary and result/receiving use. Keep these in one compact rationale. A known failure of a required condition makes that candidate inapplicable under those conditions; unresolved information leaves fit unresolved if no condition is known to fail. If changing a failed condition is worthwhile, describe that separate continuation and its cost.
4. **Compare value and burden.** Among applicable candidates compare the result the recipient can use, delay, preparation, execution, review, access and maintenance burden, risk and protected work. Do not force unlike results into one score or choose a method because it is available in the library. Recommend no new method use when an adequate current result or direct continuation is better. Preserve required verification and other obligations.
5. **Prepare the smallest meaningful work step.** Name its input and how to obtain it, performer or required capability, concrete operation, bounded work product and scope/version, completion evidence, receiver, next use and acceptance condition. Identify the intended transfer route and who can resolve acceptance. Label unconfirmed arrangements as proposed. When making an actual plan, also resolve applicable effort, resource window, dependencies and authority; otherwise return a conditional preparation note, not a scheduled promise.
6. **Order only real dependencies.** Name the exact required output/input, method condition or applicable scheduling rule that justifies an order. Display order and shared-resource competition alone do not establish precedence. A known needed input can establish a dependency while its absence makes the next operation not ready. Keep unrelated steps unordered; plan only far enough to reach the next useful decision.
7. **Set the stop and review boundary.** State when the product is sufficient, when to stop or change approach, and what evidence could change the next decision. A bounded inquiry may end with a supported unresolved answer; it must still show what was checked and why the answer has that limit. If budget or a protected condition is reached first, return the limitation rather than fabricate completion.
8. **Return and route.** Provide the recommendation and preparation note with the evidence for each readiness claim. OM.P04 checks operational readiness/admission; OM.P05 checks shared capacity. This library use changes no assignments or corporate records. If actual necessary continuation is unclaimed, use [OM.P12](OM.P12-reconcile-handoffs-and-recover-orphaned-work.md) to reconcile the handoff; planning it does not establish accepted responsibility or accepted results.
## Return and dispositions
Return **current question → selected approach and inspected grounds → serious alternative and full burden → next operation with inputs/capability → product and completion evidence → recipient/use/acceptance route → dependencies, unresolved readiness and authority → stop/recheck condition**. An existing adequate note can carry this information; a new form is optional.
| Disposition | Meaning and next use |
|---|---|
| Recommend and prepare | The approach is justified and a concrete next step is prepared; state which operational conditions are established and which need admission |
| Reuse or continue without a new method use | An adequate current result or direct continuation serves the concern; preserve its limits and any remaining obligations |
| Conditional continuation | Specify the actual missing result, capability, access or receiving arrangement; identify a bounded way to resolve it without claiming readiness |
| Reframe, choose another approach or defer | A candidate fails a condition, the request needs repair, or no new use warrants its burden; preserve existing commitments and the condition for reconsideration |
| Stop or delegate current work | The selected disposition has its actual authority, preserved results and hand-back or accepted receiving responsibility; a recommendation alone changes none of them |
The output should let a performer explain what to do next and let a receiver explain what will be usable. An unresolved recipient is a visible limit, not a reason to invent one. A nominal owner is not a resource allocation. A future acceptance criterion is not an acceptance event.
## Constructed example: selecting the next check
A grounded request asks what drives repeat checking before a service release. The cause is unresolved; versioned return records and participant access are available. Candidate approaches are a bounded reconstruction of return reasons and immediate automation of a selected check. The first has inspected steps for relating each return to the input version and reason; automation assumes a stable, selected check and a justified benefit that are not yet established.
Recommend the bounded reconstruction for the present question. Prepare one reviewable product: an account of the selected returns, supported explanation candidates and the observation that would distinguish remaining rivals. The service owner will use it to choose between preparation changes, a narrow automation trial and the current practice. The note identifies the input records, required analyst capability, review/acceptance route and stopping boundary. Any unsupplied resource slot remains unresolved for operational admission. No enterprise-wide causal conclusion or automation rollout follows from the recommendation.
A concrete preparation note for this constructed case can be brief:
| Element | Prepared continuation |
|---|---|
| Input and action | For the selected release, relate each recorded return to the input version, reported reason and relevant check; mark missing evidence and compare the live explanations |
| Capability and product | A practitioner able to interpret those records produces a bounded evidence table and an options note, separating observations, hypotheses and unresolved questions |
| Receiver and next use | The service owner uses the note to choose a preparation change, a narrow trial, continued practice or a specific further check |
| Acceptance and transfer | Submit the versioned note through the agreed review route if one exists; otherwise confirm that route. The note is adequate when its material claims are traceable, rivals and limits are explicit, and it supports the named choice or explains exactly what still prevents it |
| Readiness and stop | Confirm the practitioner's window and receiving arrangement through admission. Stop at the supported bounded finding or the agreed effort/protection limit; do not manufacture a preferred cause |
**Changed condition:** an existing account already answers the same question for the same scope/version under still-valid sources and assumptions. Reuse it and prepare the receiving decision; do not repeat the study because the project entered another named phase. If one material assumption changed, reopen that part rather than copying the old answer or restarting everything.
**Availability boundary:** an otherwise suitable inspection requires a qualified reviewer with no available slot. The method choice can remain justified, but execution is conditional. Resolve allocation, a suitable alternative or timing; assigning the reviewer in prose does not make the work ready.
## Choose an inquiry by the result it can supply
The approaches below are concrete candidates for an unresolved question, not compulsory stages. Read the selected procedure and retain its conditions before preparing work.
| Current uncertainty | Candidate operation and product | Limit that changes the choice |
|---|---|---|
| What happens when the recipient uses the product? | Follow an identified use with the recipient under OM.P16; return an account of inputs, actions, adaptations and result | One observed context does not establish prevalence or cause across all users |
| What does a participant mean or need? | Ask about a specific episode and intended receiving action; return the attributed account and consequential gaps | An interview supplies a report, not independent occurrence or causal confirmation |
| What actually waited or returned? | Relate versioned events to the required route and resources under OM.P15; return a bounded reconstruction | Missing event coverage cannot establish absent work or convert elapsed time into effort |
| Did a changed candidate invalidate a check? | Compare the changed configuration with the check's dependencies and reuse rule; return affected and unaffected claims using OM.M10 | Similar names or a new commit alone establish neither equivalence nor total invalidation |
| Can the proposed operation be carried out under the intended conditions? | Use adequate current evidence or prepare a justified authorized check under OM.P10 with required inputs, protected service and a meaningful receiving result | A new check needs provision and permission; a successful occurrence does not establish retained adoption |
For example, if a feedback form is proposed before the team knows which adaptations recipients make, a feasible walkthrough can produce the needed account first. Include participant time, review and follow-up. If sufficient current use evidence already exists, reuse it instead. [Classify Work for a Decision](../concepts/classify-work-for-a-decision.md) similarly limits classifications to distinctions that change this choice.
## Prepare stopping, deferral or delegation as real continuations
First confirm why the current work is still needed, including assurance and recovery uses; [OM.P13](OM.P13-ground-and-qualify-a-work-request.md) supplies that inquiry when its grounds are open. Compare leaving it in place, stopping, deferring, delegating or changing the method. For accepted or started work, identify the actual right to change the commitment, affected recipients, remaining support, preservation of useful results and the work required to make a safe hand-back. An unchanged obligation stays in force until its authorized revision takes effect.
Show what usable window is actually released after transition, preparation, new reading/review and residual support. Replacing a meeting with an asynchronous note does not release its entire duration if preparing and reading that note consumes the same participants. A canceled option and stopped admitted work have different histories; preserve performed work, costs and useful negative findings in the latter. A justified stopping decision can be the complete result of this method.
When delegation is selected, state what is being transferred:
| Delegated scope | What the receiving basis must establish |
|---|---|
| Execute a known operation | The applicable procedure, inputs, competence to carry it out, required checks and conditions for seeking help |
| Choose a method within stated boundaries | The receiver's actual right and ability to compare methods, the required result and constraints, and access to needed specialist support |
| Obtain a result through inquiry and adaptation | The receiving decision, scope for revising the approach, evidence and protection conditions, available provision and when commitments need reconsideration |
A title, assignment or nominal ownership proves none of those capabilities or permissions. Use available performance evidence and agreed support; do not infer skill from job title or require repeated training when the relevant ability is already established. A beginner may need a worked case, guided practice and feedback. A capable team entrusted with the problem may choose its solution within the actual limits. A professional rule can require a particular procedure in either case.
The handoff should make the first reviewable result, receiving agreement under the applicable rule, unresolved decisions, and grounds for retaining, reducing or increasing oversight explicit. Count both the receiver's work and the coach/reviewer's work in the same resource arrangement. Evidence of competent execution of a supplied method does not establish competence to choose or construct that method. [OM.P17](OM.P17-establish-and-verify-practice-adoption.md) can qualify the intended support or independence claim; [Local Autonomy or Shared Oversight](../tradeoffs/local-autonomy-or-shared-oversight.md) compares the oversight alternatives.
## Fit the next result to a usable window
When continuity affects feasibility, compare the operation with actual available windows, not only summed hours. Use relevant prior executions or a supported estimate for obtaining inputs, setup, the operation, checking and preserving its result. Distinguish active attention, autonomous processing and external waiting; establish when a person must remain available and what can be interrupted without losing necessary work.
If the next useful result does not fit, compare a larger suitable window, qualified help, another method or a smaller independently usable product. Preserve the receiving purpose and required checks. An arbitrary half of an unfinished calculation is not automatically usable; a verified discrepancy list for one specified version may be. For interruptible work, retain enough state for a sound continuation. No universal focus duration or percentage allowance follows.
For example, two separate 30-minute windows do not supply a required continuous hour. Conversely, an hour of autonomous processing can permit other work if its brief operator interventions and applicable protection are covered. An already authorized incident response remains available. A provisional window estimate stays conditional until actual allocation and support are established.
## Variant: Slice Work for Earlier Usable Feedback
When a whole result is too large for a useful feedback or resource window, compare a smaller accepted scenario, criterion, recipient use or testable assumption. Recover the original mandatory result first. For each candidate slice state **original outcome → earlier product → immediate receiver/use → acceptance evidence → still-required remainder → shared work and dependencies → usable window → next decision**. Include setup, verification, handoff and retained integration work. A smaller record alone does not create an earlier useful result.
An internal product can be sufficient: a verified discrepancy list may help QA choose the next check, and a negative prototype finding may settle a design decision. Neither needs invented independent revenue. Conversely, removing a mandatory security condition simply to finish a card does not produce the originally accepted result. Where two parts really are independently accepted, do not force them into one batch without a receiving need.
For a Scrum-oriented use, preserve the stated Sprint Goal and its indispensable dependencies. A forecast for any twelve eligible items does not show that the particular items needed for that goal will finish. Use the selected work and retained integration/acceptance conditions in [OM.P06](OM.P06-reconcile-scope-forecast-and-promise.md). Review the actually obtained feedback separately from output count. Right-sizing does not require equal task sizes or removal of necessary technical planning.
Pass the selected slice to [OM.P04](OM.P04-prepare-and-admit-work-proportionately.md) for proportionate preparation and admission; method fit does not allocate resources. The receiving transition must preserve the product/version, actual input condition and unresolved remainder. [OM.G04](../overview/compose-patterns-through-receiving-results.md) explains these conditional continuations, including stopping and reuse.
This authored variant draws on Flow Metrics for Scrum Teams chapters 5–8, Kanban Pocket Guide chapter 3 and TameFlow chapter 12; the [public bibliography](../../bibliography.md#seven-book-sources) records the editions and qualifications that preserve the distinction between an outcome bundle and a fixed immutable scope.
## Trade-offs, stopping and recheck
Method selection itself costs work. A routine, reversible repair with a known adequate procedure can use a short rationale and its existing acceptance route. Consequential, contested or later-reused decisions need enough retained basis to replay the choice, not a dossier for every candidate merely for symmetry.
Stop at a usable recommendation/preparation note, a justified reuse decision, or the precise condition blocking a useful continuation. Recheck only affected parts when the question, source assumptions, method conditions, result version, capability/access, receiving use or resource arrangement changes. A better-looking plan is not evidence of performed work or improved operating outcomes.
## Checks and grounds
The internal evaluation specification defines P14-A through P14-D and cross-cutting checks for substantive fit, reuse, precedence versus readiness, and planned versus accepted work. These are planned checks, not passing results.
E.11.PUR by Anatoly Levenchuk, FPF Library, supplies the inspected fit aspects, applicability/recommendation distinction, comparison with no new use, result reuse and justified coordination. It was read in full through MCP FPF Tools at snapshot `20261119T222731Z-7829b2bb5a02c59d`, commit `d325a051ac7b2bb37cd870f90b4ed8b2d0426e58`; see the pinned source above and [licensing notice](https://github.com/ailev/FPF/blob/d325a051ac7b2bb37cd870f90b4ed8b2d0426e58/LICENSING.md). PUR coordinates pattern uses; it does not itself create a work plan. The preparation procedure here is an authored domain extension, not a claim to implement A.15 or the full FPF protocol. Examples are constructed and do not assert new findings or interventions in a named enterprise.
Version 0.2.0 adds the bounded R1–R4 application above and links to the new drafts. The earlier source edition remains its historical basis; this extension does not requalify that source or establish agent, practitioner or field performance.
Version 0.3.0 adds executable work dispositions, the distinction between delegating execution and method choice, evidence-based support and oversight, and usable-window preparation. These are authored extensions from internal design input; preparing them does not establish their performance or effect.
## Attribution and source scope
Authored AOM text: Anna Lubenchenko, [CC BY 4.0](https://creativecommons.org/licenses/by/4.0/). Source contributions and limits are identified in the [public bibliography](../../bibliography.md). FPF sources are by Anatoly Levenchuk, FPF Library, under CC BY 4.0. This AOM adaptation adds operating instructions, explanations and constructed examples under the stated limits; it does not reproduce or implement every source method.
Content SHA-256: bbe351633a4fc0d8ad60684ba7a1e4462aa9e19a607bc793dcca3b00c90e689f